Suldal (Norway) Greenfield - RFS Q1 2029

Uptime
100%

Capacity
100 MW

PUE
< 1.20

Tier
3 equivalent
Facility

Build year
Cras nec enim risus. Curabitur dui.

Size
sqm

Tier
2/3 equivalent

Type
Greenfield, Brownfield, In operation

Power and cooling
Maximum Capacity, 100% renewable hydropower, Cooling solution

PUE
Lorem Ipsum

Automatic standby generators
Lorem Ipsum
Other

Carrier neutral
Lorem Ipsum

Meetings rooms
3

Smart hand services
3

Office space for clients
3

Fire suppression
3

Remote monitoring
3
Site highlights
- Strategically located in an area with no neighboring residential areas, and next to powersubstation with 16 MW available Metersfrom Suldaland Blåsjø(hydropower plant with >2 GW capacity), ensuring long-term energy securityat low cost§Tysingvatnetlies on site, delivering an opportunity for natural cooling, supportinghigh-density workloads and optimized PUE§Downsideprotection via unanimous local council support and put option on land at costif milestones are missed